Tornado Safe Rooms/Gymnasiums
-
In April 2019, Springfield voters approved Proposition S which enables Springfield Public Schools to make facility improvements to a number of schools. During the November 17, 2020 Board of Education meeting, it was reported that additional funds were available to address projects not included in the April 2019 bond. The Board agreed to moving forward with phase two of the Hillcrest project, the construction of a new York Elementary, and the construction of tornado safe rooms/gymnasiums at Mann, Wilder, Field and Twain elementary schools.
News and Information
-
Geotechnical Engineering & Commissioning Services for Field, Mann, Twain, Wilder
Mar. 23, 2021
During its combined meeting, the Board of Education approved the following:
Civil engineering, land surveying services, and geotechnical engineering services approved
Jan. 19, 2021
During its combined meeting, the Board of Education approved:
Architectural services approved for Mann, Wilder, Field and Twain storm shelter gymnasiums
Dec. 8, 2020
During its combined meeting, the Board of Education approved:
-
Choral Risers for stage at Field
March 28, 2023
During its combined meeting, the Board of Education received the following:
Change orders/agreements for Twain and Field include stormwater inlet, treated plywood and submittal exchange
December 13, 2022
During its combined meeting, the Board of Education approved the following:
Field (cameras/licenses, seed, sod, and awning) Twain (cameras/licenses, sod, chain link gate, asphalt paving and striping)
November 29, 2022
During its combined meeting, the Board of Education approved the following:
Field - door access controls, cameras, and removal/replacement of asphalt
October 11, 2022
During its study session, the Board of Education approved the following:
Field (asphalt, projector power/controls, yard hydrant, and vinyl numbers to existing doors - Twain (painting, camera rough-ins, vinyl numbers to existing doors, and fire department connection sign
September 27, 2022
During its regular meeting, the Board of Education approved the following:
Field (music classroom furniture, greenhouse, block flooring, concrete) Twain (music classroom furniture, wall phone device, block flooring)
August 16, 2022
During its combined meeting, the Board of Education approved the following:
Field (regrading playground and receptacle removal) Twain (tile and electrical line connection)
June 21, 2022
During its regular meeting, the Board of Education approved the following:
Field (Unsuitable soil and rock allowances and sewer line) Twain (Sewer adjustments, relocation of fire department connection)
May 17, 2022
During its combined meeting, the Board of Education approved the following:
Field (gas/water service, FF&E-audio visual equipment and A&E testing and balancing services) Twain (FF&E-audio visual equipment)
March 22, 2022
During its combined meeting, the Board of Education approved the following:
FF&E - physical education equipment at Field/Twain
February 15, 2022
During its combined meeting, the Board of Education approved the following:
FF&E - physical education equipment and tree removal at Field/Twain
January 18, 2022
During its combined meeting, the Board of Education approved the following:
Utility code requirements, testing and balancing credit, underground fiber optic routing, drywall expansion joints, tree removal at Field/Twain
Dec. 7, 2021
During its combined meeting, the Board of Education approved:
IT switches for Twain and Field and access points and playground equipment removal/reinstallation for Field
October 5, 2021
During its study session, the Board of Education approved the following:
Project management software for Field
August 17, 2021
During its combined meeting, the Board of Education approved the following:
Mann and Wilder MEP engineering & architectural services
August 17, 2021
During its combined meeting, the Board of Education approved the following:
Project management software for Field and Twain
August 17, 2021
During its combined meeting, the Board of Education approved the following:
Bids for Field and Twain storm shelter/gymnasium
June 8, 2021
During its combined meeting, the Board of Education approved the following:
Field, Mann and Twain testing and balancing services
May 18, 2021
During its combined meeting, the Board of Education approved the following:
Mann and Wilder commissioning services
Apr. 27, 2021
During its regular meeting, the Board of Education approved the following: